-
Pre-treatment process: The supply of milk sources has a direct impact on the planning arrangement; the classification and storage of milk is difficult and requires quick digestion; the original milk data is collected manually, resulting in low real-time performance.
-
Pre-treatment process: High level of automation, but various system information is not integrated; Ensuring the continuous operation of individual machines and improving the output efficiency of bottleneck resources are key pain points; The scheduling of tank resources (mixing, fermentation, waiting for loading) is complex; Process pipelines are restricted, and preventing errors and omissions in material usage is a major difficulty; Equipment shutdown for material preparation may lead to unnecessary costs; The energy consumption situation cannot be analyzed in real time for value assessment.
-
Finished Goods Warehouse Section: Significant inventory fluctuations, inaccurate accounting; difficult data aggregation, delayed decision-making; inability to share inventory information in real time; challenging inventory location management.
Dairy products

Industry pain points
Advantages and Effects of the Plan
Solution
Typical cases